Future-automation ML User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
Installation: Stage 6
Page 10 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
ML - Heavy Duty Lift Mechanism
Adjusting the Flap Closed Position
CABINET BASE - SIDE VIEW
1. - By adjusting the white screw, at each side
of the lift, you can adjust the tilt of the flap.
CABINET BASE - PLAN VIEW
2. - By loosening the M6 bolts on each side under
the flap, you can adjust the position of the flap in the
cabinet top. Aim for a 3mm [1/8”] gap all round.
CABINET BASE - SIDE VIEW
3. - For further adjustment
you can adjust the push
rod length by screwing the
studding in or out.
1.
2.
3.
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 21 22

Comments to this Manuals

No comments